There has been quite a lag between these blog posts. So here is a teeny bit, with pictures!

Sink & toilet before:
Sink & toilet after:

Shower before:

Shower after:











And now, the new lights above where the new mirror will be (you can just see the top of the hole in the wall at the bottom):This is after the demolition of the wall in between the closet and bathroom, and the doorway between the bathroom and hallway:
.jpg)
And this is the new doorway framed in. The closet door is on the left, and the bedroom door is on the right:
The apartment is being painted right now. There will be more pictures here soon...


